Electrical Contractor Release Form
Electrical contractors use this form to identify themselves and a project and accept responsibility for electrical contracting work in Duck.
What this form is
The Electrical Contractor Release Form identifies the project and the electrical contractor or company, including contact details, license number, and classification. The signer affirms or swears they are licensed and qualified to assume responsibility for the project, and agrees to notify the Town of Duck Building Inspector if they resign or are no longer affiliated with it.
Who needs it
An electrical contractor signing on to a project in Duck can use this form to provide project and license information and accept responsibility.
How to submit it
The form lists fax number 252.255.1236. It does not provide a mailing address, email, or other submission instructions.
About notarization
This form has no notary block and is signed and dated by the licensee; its affirm-or-swear wording identifies no notarized attachment or step.
How to submit this form
- 1
Download The Form
Download the Electrical Contractor Release Form PDF.
- 2
Complete The Form
Enter the permit and project details, contractor information, contact details, license number, and classification.
- 3
Sign And Date
The licensee signs and dates the form and makes the statement about qualifications and project responsibility.
- 4
Fax The Form
Fax the completed form using the number printed on it: 252.255.1236.
Frequently asked questions
- What information does the Electrical Contractor Release Form request?
- It requests the permit number, job cost, project address, contractor and company details, contact information, email, license number, and classification.
- Who signs the Electrical Contractor Release Form?
- The form says it must be signed and dated by the licensee, who affirms or swears they are licensed and qualified to assume responsibility for the project.
- How do I submit the Electrical Contractor Release Form?
- The form lists fax number 252.255.1236. It does not state another submission method.
- Do I need a notary for the Electrical Contractor Release Form?
- No. The form has no notary block; the licensee signs and dates it. Its affirm-or-swear wording does not identify a notarized attachment or step.