Asheboro, NC · Randolph County

No notary required

Application For Building Permit

Property owners and contractors use this application to request a permit for building work in Asheboro.

What this form is

This application requests a building permit for work at a property in Asheboro. It asks for the project location, owner and contractor details, type of work, building dimensions, square footage, number of stories, and building cost. The form notes that a zoning permit may be required before a building permit is issued and that project drawings must be submitted at least two weeks before issuance.

Who needs it

Property owners or contractors seeking a permit for building work in Asheboro should complete the application.

How to submit it

The form lists Asheboro Building Inspections at 146 N. Church St., Asheboro, NC 27203, with a phone number and fax number; it does not specify a submission method.

About notarization

This application is signed without a notary; the applicant signs and dates the form, and no notarized or sworn attachment is mentioned.

How to submit this form

  1. 1

    Download The Application

    Download the Asheboro Application for Building Permit PDF.

  2. 2

    Complete The Application

    Enter the date, project location, owner and contractor details, work type, building information, and cost.

  3. 3

    Gather Project Drawings

    Prepare project drawings for submission at least two weeks before building permit issuance, as stated on the form.

  4. 4

    Submit To Building Inspections

    Submit the application to Asheboro Building Inspections at the address listed on the form; it does not specify a submission method.

Frequently asked questions

Do I need a notary for the Asheboro building permit application?
No. The application is signed without a notary; the applicant signs and dates it, and the form does not mention a notarized or sworn attachment.
How do I submit the Asheboro building permit application?
The form lists Asheboro Building Inspections at 146 N. Church St., Asheboro, NC 27203, and provides a phone and fax number. It does not specify how to submit the application.
What information does the building permit application request?
It asks for the project location, property owner and contractor details, type of work, building dimensions, square footage, number of stories, and building cost.
Are drawings required with the application?
The form says project drawings need to be submitted at least two weeks before building permits are issued.