Asheboro, NC · Randolph County

No notary required

Floodplain Development Permit Application

Property owners or applicants use this application to request a permit for proposed development in a designated flood hazard area.

What this form is

The application requests information about the applicant, owner, property, proposed work, flood elevations, and relevant construction details. It is for development in a designated flood hazard area, and the city requires a completed application, a scaled site plan certified by a registered land surveyor or professional engineer, and all items required by Section 904.2(1) of the Asheboro Zoning Ordinance. A $150 fee is required.

Who needs it

Applicants seeking permission to develop in a designated flood hazard area should complete the application and provide the required supporting information.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. A $150 application fee is required.

About notarization

This document is signed and dated without a notary; it does not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Floodplain Development Permit Application PDF.

  2. 2

    Complete The Application

    Fill in the applicant, owner, property, proposed development, and applicable construction details.

  3. 3

    Gather Required Attachments

    Include a scaled site plan certified by a registered land surveyor or professional engineer and all other required items.

  4. 4

    Submit To The City

    Submit the application and required materials to the city department named on the form; a $150 fee is required.

Frequently asked questions

Do I need a notary for the Floodplain Development Permit Application?
No. The application has a signature and date line but no notary block. The form does not identify any attachment or related step that must be notarized or sworn.
How do I submit the Floodplain Development Permit Application?
Submit it to the city department named on the form; check the city website for current contact details. The application states that a $150 fee is required.
What must accompany the application?
The form requires a completed application, a site plan drawn to scale and certified by a registered land surveyor or professional engineer, and all items required by Section 904.2(1) of the Asheboro Zoning Ordinance.
What information does the application ask for?
It asks for applicant, owner, and property details; a description and location of the work; flood zone and elevation information; and details about existing structures, non-residential construction, or subdivisions when applicable.

Need something notarized?

This Floodplain Development Permit Application doesn’t need a notary — but if you have another Asheboro form that does, a commissioned online notary can help.