Galion, OH · Crawford County

No notary required

Pool Application

Property owners or their applicants use this application to request approval for pool construction or other proposed pool work in Galion.

What this form is

The City of Galion Building and Zoning Department uses this application to review proposed pool work, including new construction, additions, alterations, or changes in occupancy or use. It asks for applicant, owner, property, builder, lot, pool, and estimated construction cost details. Attach a site drawing and applicable construction drawings. Upon approval of the application and site drawing, the pool application fee is $25.

Who needs it

Property owners or applicants proposing pool construction or other listed work on a property in Galion should complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the document lists no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Pool Application PDF.

  2. 2

    Complete The Application

    Fill in applicant, property, builder or installer, proposed work, pool dimensions, and estimated construction cost details.

  3. 3

    Gather Drawings

    Attach plans or drawings showing the lot, buildings, proposed work, and construction details if applicable.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Who uses the Galion Pool Application?
The applicant provides information about the property, proposed pool work, builder or installer, pool dimensions, and estimated construction cost.
What attachments does the application request?
Attach plans or drawings showing the lot's approximate dimensions and shape, existing or proposed buildings and alterations, and construction drawings if applicable.
Do I need a notary for the Pool Application?
No. The application has a signature and date line but no notary block; the signer just signs and dates it.
How do I submit the Pool Application?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Pool Application doesn’t need a notary — but if you have another Galion form that does, a commissioned online notary can help.