Property owners and contractors use this application to request a permit for planned street openings in Pepper Pike.

What this form is

This application requests city approval for work that opens a street, including openings in a grass tree lawn or paved roadway. It asks for the street address, owner and contractor information, purpose and size of the opening, number of openings, and anticipated start and completion dates. The form also lists approval, traffic-control, inspection, cleanup, and deposit information.

Who needs it

Property owners or contractors planning a street opening in Pepper Pike should complete the application and obtain city approval.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. The form lists City Hall at 28000 Shaker Boulevard, Pepper Pike, Ohio 44124.

About notarization

This application is signed and dated without a notary; the form lists no notarized or sworn attachment or related step.

How to submit this form

  1. 1

    Download The Application

    Download the Street Opening Permit application PDF.

  2. 2

    Complete The Form

    Fill in the project address, owner and contractor information, opening details, and anticipated dates.

  3. 3

    Check Project Requirements

    Review the listed approval, traffic-control, inspection, and deposit information; the form does not list attachments.

  4. 4

    Submit To The City

    Check the city website for current contact details and submit the application to the appropriate city department.

Frequently asked questions

Do I need a notary for the Street Opening Permit?
No. The application has a signature and date line but no notary block; it lists no notarized or sworn attachment or related step.
How do I submit the Street Opening Permit?
The form does not specify a submission method. Check Pepper Pike’s website for current contact details or use the City Hall address printed on the form.
What information does the application ask for?
It asks for the project address, owner and contractor, purpose, opening location and size, number of openings, and anticipated start and completion dates.
What deposits does the form list?
The form lists a $600 deposit for openings on the same side of the street and a $1,500 deposit for openings across the side.

Need something notarized?