Bellefontaine, OH · Logan County
Utility / Right-of-Way Permit Application
The application lets property owners and contractors request city permits for utility work, street openings, sidewalks, curbs, driveways, sanitary or storm work, and water service.
What this form is
Use this application to request a permit for utility work in Bellefontaine, including new service or repair and replacement work. It asks for the work-site, owner, applicant, and contractor information, details about the proposed improvements, and inspection needs. The applicant agrees to comply with the stated conditions by signing; the form says all fees must be paid before work commences.
Who needs it
Property owners or contractors planning utility improvements, street openings, or related work covered by the application should complete it.
How to submit it
The form lists the Engineering Department at 135 N Detroit St, Bellefontaine, Ohio 43311, and [email protected]. It states all fees must be paid before work commences.
About notarization
This application is signed without a notary; the applicant signs and dates it, and the form mentions no notarized or sworn attachment.
How to submit this form
- 1
Download The Application
Download the Utility / Right-of-Way Permit Application PDF.
- 2
Complete The Applicable Fields
Print clearly and provide applicant, owner, contractor, work-site, improvement, and inspection information as applicable.
- 3
Check Work Requirements
Review the form's instructions about boulevard trees, calling OUPS before digging, and inspection notice when an inspection is required.
- 4
Sign And Date
Sign and date the application to agree to comply with its stated conditions.
- 5
Submit To Engineering
Use the Engineering Department address or email listed on the form. The form says all fees must be paid before work commences.
Frequently asked questions
- What is the Utility / Right-of-Way Permit Application for?
- It requests permits for utility improvements, including street openings, sidewalks, curbs, driveways, sanitary or storm work, and water service.
- Who completes this application?
- The form provides spaces for applicant, owner, and contractor information, along with details about the work site and proposed improvements.
- Do I need a notary for the Utility / Right-of-Way Permit Application?
- No. The application has an applicant signature and date line but no notary block; the form mentions no notarized or sworn attachment.
- How do I submit the Utility / Right-of-Way Permit Application?
- The form lists the Engineering Department at 135 N Detroit St, Bellefontaine, Ohio 43311, and [email protected]. It says fees must be paid before work commences.
