Waterville, OH · Lucas County

No notary required

Application for Water Tap Inspection

Property owners or their applicants use this form to request a water tap inspection and identify the contractor and meter or tap fees.

What this form is

This application requests a water tap inspection and records the property location, owner, contractor, service line size, and requested meter or tap fees. It also asks whether the work requires a street, alley, or public-way opening, which requires an additional permit. The applicant certifies that right-of-way work will be done by a contractor with a performance bond on file and agrees not to cover the connection before Water Department approval.

Who needs it

A property owner or applicant requesting a water tap inspection should complete the form and provide the location, contractor, and requested service details.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the applicant signs and dates it, and the inspector completes the inspection report.

How to submit this form

  1. 1

    Download The Application

    Download the Water Tap Inspection Application PDF.

  2. 2

    Complete The Form

    Enter the location, owner and contractor details, line size, requested fees, and whether a public-way opening is needed.

  3. 3

    Check The Permit Requirement

    If the tap requires a street, alley, or public-way opening, the form says an additional permit is required.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Water Tap Inspection Application request?
It requests a water tap inspection and collects the property location, owner and contractor details, service line size, and applicable tap or meter fees.
Do I need a notary for the Water Tap Inspection Application?
No. The applicant signs and dates this application without a notary; the inspector completes and signs the inspection report.
How do I submit the Water Tap Inspection Application?
Submit it to the city department named on the form; check the city website for current contact details. The contractor must notify the Water Department two working days before the tap.
Is another permit needed if the tap requires a street opening?
Yes. The application says an additional permit is required if the tap requires a cut or opening in a street, alley, or public way.

Need something notarized?

This Application for Water Tap Inspection doesn’t need a notary — but if you have another Waterville form that does, a commissioned online notary can help.