Waterville, OH · Lucas County
Application for Water Tap Inspection
Property owners or their applicants use this form to request a water tap inspection and identify the contractor and meter or tap fees.
What this form is
This application requests a water tap inspection and records the property location, owner, contractor, service line size, and requested meter or tap fees. It also asks whether the work requires a street, alley, or public-way opening, which requires an additional permit. The applicant certifies that right-of-way work will be done by a contractor with a performance bond on file and agrees not to cover the connection before Water Department approval.
Who needs it
A property owner or applicant requesting a water tap inspection should complete the form and provide the location, contractor, and requested service details.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This application is signed and dated without a notary; the applicant signs and dates it, and the inspector completes the inspection report.
How to submit this form
- 1
Download The Application
Download the Water Tap Inspection Application PDF.
- 2
Complete The Form
Enter the location, owner and contractor details, line size, requested fees, and whether a public-way opening is needed.
- 3
Check The Permit Requirement
If the tap requires a street, alley, or public-way opening, the form says an additional permit is required.
- 4
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What does the Water Tap Inspection Application request?
- It requests a water tap inspection and collects the property location, owner and contractor details, service line size, and applicable tap or meter fees.
- Do I need a notary for the Water Tap Inspection Application?
- No. The applicant signs and dates this application without a notary; the inspector completes and signs the inspection report.
- How do I submit the Water Tap Inspection Application?
- Submit it to the city department named on the form; check the city website for current contact details. The contractor must notify the Water Department two working days before the tap.
- Is another permit needed if the tap requires a street opening?
- Yes. The application says an additional permit is required if the tap requires a cut or opening in a street, alley, or public way.
