Application for Sign Permit Temporary or Permanent Signs

Property owners or applicants use this application to request a zoning permit for a temporary or permanent sign in Westfield Center.

What this form is

Use this application to request a zoning permit before constructing or placing a temporary or permanent sign. It asks for the property address, parcel number, zoning district, sign details, and applicant and property owner information. Attach two copies each of a site plan and construction plans; the site plan must show lot and sign dimensions and sign setbacks. The Zoning Inspector must approve the application and applicable fees must be paid before the permit is issued.

Who needs it

Applicants seeking to construct or place a temporary or permanent sign on a property in Westfield Center need this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed without a notary; the applicant and property owner, if different, sign and date it.

How to submit this form

  1. 1

    Download The Application

    Download the sign permit application for temporary or permanent signs.

  2. 2

    Complete The Application

    Provide the property and sign details, applicant information, and property owner information if the owner is not the applicant.

  3. 3

    Gather The Attachments

    Attach two copies each of the site plan and construction plans as described on the form.

  4. 4

    Submit To The City

    Submit the completed application and attachments to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the sign permit application?
No. The application has signature and date lines for the applicant and, if different, the property owner; it does not require a notary.
How do I submit the sign permit application?
Submit it to the city department named on the form; check the city website for current contact details.
What attachments are required?
Attach two copies of a site plan showing lot and sign dimensions and sign setbacks, plus two copies of the construction plans.
When is the sign permit required?
The form says a zoning permit is required before construction or placement of a sign begins. The Zoning Inspector must approve the application and applicable fees must be paid before the permit is issued.