Tipp City, OH · Miami County

No notary required

Zoning Occupancy/Change of Use Permit

Business owners apply for this Tipp City permit before a new tenant occupies a non-residential property or changes its use.

What this form is

Tipp City requires an approved Change of Use Permit before a new tenant occupies a building for a business, office, commercial, or other non-residential use. The application asks for business and owner details, the proposed use, employee count, operating days and hours, occupied square footage, and building frontage. Applicants must provide site and floor plans; industrial uses also require an approved wastewater declaration, and the form lists a $40 fee.

Who needs it

Business owners or tenants proposing a change of occupancy or use at a non-residential property within Tipp City need this application.

How to submit it

The form lists a $40 fee but does not provide a submission address or method. Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This form is signed and dated by the applicant without a notary; the document lists no sworn or notarized attachments.

How to submit this form

  1. 1

    Download The Application

    Download the Zoning Occupancy/Change of Use Permit PDF.

  2. 2

    Complete The Application

    Enter the business and owner details, proposed use, employee count, hours, occupied square footage, and building frontage.

  3. 3

    Gather Required Attachments

    Provide a site plan and floor plan of the area to be occupied. Industrial uses also require an approved wastewater declaration.

  4. 4

    Submit To The City

    The form lists a $40 fee but no submission method. Submit it to the city department named on the form and check the city website for current contact details.

Frequently asked questions

Who needs the Tipp City Change of Use Permit?
Business owners or tenants planning a change of occupancy or use at a non-residential property within Tipp City need an approved permit before the new tenant occupies the building.
What information and attachments does the application require?
It asks for business and owner details, proposed business type, employees, operating hours, occupied square footage, and building frontage. Include site and floor plans; industrial uses also require an approved wastewater declaration.
Do I need a notary for the Zoning Occupancy/Change of Use Permit?
No. The applicant signs and dates this form without a notary. The document lists no sworn or notarized attachments.
How do I submit the Change of Use Permit?
The form lists a $40 fee but does not specify a submission address or method. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Zoning Occupancy/Change of Use Permit doesn’t need a notary — but if you have another Tipp City form that does, a commissioned online notary can help.