Germantown, OH · Montgomery County

No notary required

Demolition Permit

Property owners or contractors use this application to request authorization to demolish a structure in Germantown.

What this form is

This application requests demolition authorization and lists agency and utility sign-offs that must be obtained, or utility disconnects confirmed by the owner or contractor, before a permit can be issued. It asks for the demolition site address, structure type, owner and contractor contact information, and signatures and dates. Commercial and industrial structures also require an asbestos abatement survey.

Who needs it

Property owners or contractors seeking a demolition permit must complete this application and obtain the required agency or utility sign-offs.

How to submit it

Return the completed form to the Building Inspection Department, as directed on the application. The form identifies the municipality at 1 North Plum Street.

About notarization

This document is signed without a notary; the owner or contractor confirms utility disconnects, and the applicant signs and dates the form.

How to submit this form

  1. 1

    Download The Application

    Download the Demolition Permit application PDF.

  2. 2

    Complete The Form

    Enter the site address, structure type, and owner and contractor contact information.

  3. 3

    Gather Required Sign-Offs

    Obtain the listed agency and utility signatures, or have the owner or contractor confirm utility disconnects. Commercial and industrial structures require an asbestos abatement survey.

  4. 4

    Return The Application

    Return the completed form to the Building Inspection Department.

Frequently asked questions

Who uses the Germantown Demolition Permit application?
Property owners or contractors seeking authorization to demolish a structure use the application. It requests the site address, structure type, and owner and contractor contact information.
What sign-offs are required for a demolition permit?
The application lists Planning/Zoning, Engineering, Water/Sewer, Electric, and Gas sign-offs. The owner or contractor may instead confirm and sign off on utility disconnects before a permit can be issued.
Do I need a notary for the Germantown Demolition Permit?
No. The application has no notary block; the owner or contractor confirms utility disconnects, and the applicant signs and dates the form.
How do I submit the Germantown Demolition Permit application?
Return the completed application to the Building Inspection Department, as directed on the form.

Need something notarized?

This Demolition Permit doesn’t need a notary — but if you have another Germantown form that does, a commissioned online notary can help.