Piketon, OH · Pike County

No notary required

Zoning Permit Application

Piketon property owners use this application to request zoning approval for building or property work and provide project details to the village.

What this form is

The application asks for property and owner details, a description and cost of the work, and signatures from the owner and contractor. It also includes a driveway permit section for work within village street rights-of-way and instructions for driveway construction. Applicants must attach a scaled plan drawing showing property and building dimensions and distances from property lines.

Who needs it

Property owners applying for zoning approval for a building or structure, or requesting a driveway permit for work in a village street right-of-way, use this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed without a notary; the form asks the owner and contractor to sign and date, and lists no sworn or notarized attachment.

How to submit this form

  1. 1

    Download The Application

    Download the Zoning Permit Application PDF.

  2. 2

    Complete The Application

    Provide the requested property, owner, work, and contractor details, and initial each page as instructed.

  3. 3

    Gather The Required Plan

    Attach a scaled drawing showing property and structure dimensions and distances from property lines.

  4. 4

    Submit The Application

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Zoning Permit Application?
No. The application asks the owner and contractor to sign and date it, and lists no sworn or notarized attachment.
How do I submit the Zoning Permit Application?
The document does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.
What plan must I attach to the application?
Attach a scaled plan drawing showing the property dimensions, existing and proposed structures, and each structure’s distance from the property lines.
Does the application include a driveway permit section?
Yes. It includes a driveway permit section for work within or installation within the right-of-way limits of village streets in Piketon.

Need something notarized?

This Zoning Permit Application doesn’t need a notary — but if you have another Piketon form that does, a commissioned online notary can help.