South Webster, OH · Scioto County
Zoning Permit Application
Property owners and applicants use this application to request a South Webster zoning permit for new construction, additions, or a change in use.
What this form is
The Village of South Webster requires a zoning permit application for new construction, additions, or a change in use; improvements that do not change an existing building footprint on an existing parcel do not require a permit. The application asks for property, owner, and contractor details, building information, and water and sewer sources. Applicants must submit two site plans showing the lot and proposed and existing structures.
Who needs it
Property owners or applicants proposing new construction, an addition, or a change in use in South Webster need to submit this application.
How to submit it
Send the completed application, required application fee, and two site plans to the Village of South Webster, Attn: Zoning Administrator, P.O. Box 38, South Webster, OH 45682. The document says permits are normally issued within 48–96 hours if there are no conflicts.
About notarization
This application is signed without a notary; the applicant signs and dates the form, and it does not identify any notarized or sworn attachment.
How to submit this form
- 1
Download The Application
Get the Zoning Permit Application from the Village of South Webster website.
- 2
Complete The Application
Provide the property, owner, contractor, building, water, and sewer information requested, then sign and date the application.
- 3
Prepare Site Plans
Include two site plans showing the lot, corner pins, existing and proposed structures, parking spaces, and distances to lot lines.
- 4
Submit To The Village
Send the application, required fee, and site plans to the Zoning Administrator at P.O. Box 38, South Webster, OH 45682.
Frequently asked questions
- Do I need a notary for the Zoning Permit Application?
- No. The application has a signature and date line but no notary block. The applicant signs and dates the form; no notarized or sworn attachment is identified.
- Who needs a South Webster zoning permit?
- The application checklist says a permit is required for new construction, additions, or a change in use. Improvements that do not change the existing building footprint on an existing parcel do not require a permit.
- How do I submit the Zoning Permit Application?
- Send the completed application, required application fee, and two site plans to the Village of South Webster, Attn: Zoning Administrator, P.O. Box 38, South Webster, OH 45682.
- What should the site plans show?
- Submit two plans showing the lot's actual size, dimensions, and shape, with corner pins, existing and proposed buildings and structures, parking spaces, and distances to lot lines.
