Green, OH · Summit County

No notary required

Right of Way Project Permit Application

Contractors and property owners use this application to request a Green permit for right-of-way work, including driveways, sidewalks, culverts, utilities, and road openings.

What this form is

Use this application to request a permit for a right-of-way project in Green, including new construction or reconstruction. Submit it with a project drawing and dimensions no larger than 11 by 17 inches at least 14 days before the project starts. The form asks for project, contractor, and property owner details, the type of work, and a project explanation; construction documents or plans must also be attached.

Who needs it

Contractors or property owners planning right-of-way work in Green should complete the application and provide project plans for review.

How to submit it

Complete the application and submit it with a project drawing and dimensions, no larger than 11 by 17 inches, to Green Zoning at 1755 Town Park Blvd or by email to [email protected]. Submit at least 14 days before the project starts.

About notarization

This application is signed and dated without a notary; the listed project drawing and construction documents or plans are attachments, with no sworn or notarized step stated.

How to submit this form

  1. 1

    Download The Application

    Download the Right of Way Project Permit Application PDF.

  2. 2

    Complete The Application

    Enter the project, contractor, and property owner information, select the work type, and explain the project.

  3. 3

    Gather Project Plans

    Attach a project drawing and dimensions no larger than 11 by 17 inches, plus construction documents or plans for review.

  4. 4

    Submit To Green Zoning

    Submit the application and attachments to Green Zoning at least 14 days before the project starts.

Frequently asked questions

What is the Right of Way Project Permit Application for?
It requests a Green permit for right-of-way work, such as an apron, curb cut, culvert, sidewalk, utility, stormwater project, or road opening.
What should I attach to the application?
Attach a project drawing and dimensions no larger than 11 by 17 inches, along with construction documents or plans for review.
How do I submit the Right of Way Project Permit Application?
Submit the completed application and project information to Green Zoning at 1755 Town Park Blvd or [email protected] at least 14 days before the project starts.
Do I need a notary for the Right of Way Project Permit Application?
No. The applicant signs and dates the application without a notary. The listed project drawing and construction documents or plans are attachments; the form does not state a sworn or notarized step.

Need something notarized?

This Right of Way Project Permit Application doesn’t need a notary — but if you have another Green form that does, a commissioned online notary can help.