McDonald, OH · Trumbull County
Swimming Pool Pre-Construction Application
Property owners apply for a pre-construction review and swimming pool permit by providing property, pool, drainage, contractor, and project cost information.
What this form is
This application requests a pre-construction review for a proposed swimming pool and may be used as the basis for issuing a pool permit. Applicants provide the property address, owner and contractor details, pool type and capacity, drainage provisions, and project cost. The form also requires scaled lot and pool plans, a manufacturer's brochure, and protective fence information if required; it states that construction must not begin until the permit is approved and issued.
Who needs it
A property owner applying for pre-construction review and a swimming pool permit in McDonald needs to complete and sign this application.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed and dated by the property owner without a notary; the form does not mention any notarized or sworn attachment.
How to submit this form
- 1
Download The Application
Download the Swimming Pool Pre-Construction Application PDF.
- 2
Complete The Application
Fill in the property, owner, pool, drainage, contractor, and project cost information.
- 3
Gather Required Attachments
Include scaled plans, a manufacturer's brochure, and protective fence information if required.
- 4
Sign And Submit
Sign and date the application, then submit it to the city department named on the form.
Frequently asked questions
- Do I need a notary for the Swimming Pool Pre-Construction Application?
- No. The property owner signs and dates the application without a notary, and the form does not mention any notarized or sworn attachment.
- How do I submit the Swimming Pool Pre-Construction Application?
- Submit it to the city department named on the form; check the city website for current contact details.
- What attachments does the swimming pool application require?
- The application calls for scaled plans showing the lot, existing structures, and proposed pool, along with a manufacturer's brochure and protective fence information if required.
- Can I begin pool construction after submitting the application?
- No. The form says not to begin construction until after the pool permit is approved and issued.
Need something notarized?
This Swimming Pool Pre-Construction Application doesn’t need a notary — but if you have another McDonald form that does, a commissioned online notary can help.
