McDonald, OH · Trumbull County

No notary required

Swimming Pool Pre-Construction Application

Property owners apply for a pre-construction review and swimming pool permit by providing property, pool, drainage, contractor, and project cost information.

What this form is

This application requests a pre-construction review for a proposed swimming pool and may be used as the basis for issuing a pool permit. Applicants provide the property address, owner and contractor details, pool type and capacity, drainage provisions, and project cost. The form also requires scaled lot and pool plans, a manufacturer's brochure, and protective fence information if required; it states that construction must not begin until the permit is approved and issued.

Who needs it

A property owner applying for pre-construction review and a swimming pool permit in McDonald needs to complete and sign this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed and dated by the property owner without a notary; the form does not mention any notarized or sworn attachment.

How to submit this form

  1. 1

    Download The Application

    Download the Swimming Pool Pre-Construction Application PDF.

  2. 2

    Complete The Application

    Fill in the property, owner, pool, drainage, contractor, and project cost information.

  3. 3

    Gather Required Attachments

    Include scaled plans, a manufacturer's brochure, and protective fence information if required.

  4. 4

    Sign And Submit

    Sign and date the application, then submit it to the city department named on the form.

Frequently asked questions

Do I need a notary for the Swimming Pool Pre-Construction Application?
No. The property owner signs and dates the application without a notary, and the form does not mention any notarized or sworn attachment.
How do I submit the Swimming Pool Pre-Construction Application?
Submit it to the city department named on the form; check the city website for current contact details.
What attachments does the swimming pool application require?
The application calls for scaled plans showing the lot, existing structures, and proposed pool, along with a manufacturer's brochure and protective fence information if required.
Can I begin pool construction after submitting the application?
No. The form says not to begin construction until after the pool permit is approved and issued.

Need something notarized?

This Swimming Pool Pre-Construction Application doesn’t need a notary — but if you have another McDonald form that does, a commissioned online notary can help.