Belpre, OH · Washington County

Stormwater Inspection & Maintenance Agreement

This agreement sets out stormwater system maintenance, inspection, and reporting duties for the property owner submitting a post-construction project to the City of Belpre.

Detailed form~25 min to notarize
  • licensed online notary
  • ~15 min average
  • Notarized PDF emailed

What you’ll need

  • Government-issued photo ID
  • Webcam-enabled device (laptop or phone)
  • This form, ready to upload as a PDF

What this form is

Use this Exhibit E template for post-construction stormwater control measures associated with a project in Belpre. The property owner agrees to maintain the system, submit annual inspection reports and maintenance logs, and arrange a professional inspection report every five years. The form says it must be signed by the permit holder or owner, and failure to provide it may result in denial of an occupancy permit.

Who needs it

A permit holder or property owner with post-construction stormwater control measures must complete this agreement for the City of Belpre.

Why it needs a notary

The form carries an acknowledgment-before-me block; the owner signing the agreement must acknowledge the signature before the notary.

How to get this notarized

  1. 1

    Download The Agreement

    Download Belpre’s Exhibit E Stormwater Inspection & Maintenance Agreement template.

  2. 2

    Complete Project Details

    Fill in the project, property, owner, and agreement information, following the city’s template.

  3. 3

    Book An Online Notary

    Schedule a session with a commissioned online notary and have identification ready.

  4. 4

    Sign On Video

    Sign the agreement and acknowledge your signature during the online notarization session.

  5. 5

    Submit For Recording

    Submit the completed agreement for recording in Washington County, usually through a title company’s e-recording process.

Preview the form

The blank PDF straight from Belpre. Look it over, then upload your filled copy to start the notary session.

Open in new tab
Info

You’ll need ID and a webcam.

A licensed online notary will join you on video, verify your government-issued ID, witness your signature, and apply their seal. You’ll receive the notarized PDF by email when the session ends.

Frequently asked questions

How do I submit this agreement for recording?
The agreement says it must be recorded in the Washington County Recorder’s Office. Recorder documents go through e-recording, usually via a title company; check with the recorder or your title company about submission.
Do I need to notarize this agreement?
Yes. The form includes an acknowledgment-before-me block for the owner’s signature, with spaces for the notary’s signature and commission expiration.
Can I sign this agreement with a remote online notary?
Ohio authorizes online notarization for its own notaries under R.C. §§147.60–147.66. A commissioned online notary can notarize your signature by video; confirm the city’s submission requirements if unsure.
When does Belpre require this form?
The form is for post-construction stormwater control measures and says failure to provide it may result in denial of an occupancy permit. Confirm with the city or village if unsure.

Ready to notarize your Stormwater Inspection & Maintenance Agreement?

Drop your email below — we’ll hand you straight to a licensed notary in the next session.