Economy, PA · Beaver County
Demolition Permit Application
Economy Borough property owners or authorized agents use this application and checklist to request a permit for building demolition and provide project details.
What this form is
This application and checklist are for requesting a building demolition permit from Economy Borough’s Department of Code Enforcement. It asks for property and project information, owner or agent details, and a proposed demolition date, and lists required plans and utility or septic-related steps. The checklist says to complete the permit application with the required fee.
Who needs it
A property owner or authorized agent planning to demolish a building in Economy Borough should complete the application and applicable checklist items.
How to submit it
The form does not provide a submission address or method. Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the signer signs and dates the application, and checklist acknowledgments are marked with initials.
How to submit this form
- 1
Download The Application
Download the Demolition Permit Application and checklist.
- 2
Complete The Application
Enter the property and project details, owner or agent information, and proposed demolition date.
- 3
Gather Required Plans
Prepare two site plans identifying the structure location and footprint square footage.
- 4
Complete Checklist Items
Contact 811 and complete applicable utility, septic, sewer, and well checklist items.
- 5
Submit To The Borough
Submit the application with the required permit fee to the department named on the form; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the Demolition Permit Application?
- No. The application has an owner or applicant signature and date, but no notary block. Checklist acknowledgments are marked with initials.
- How do I submit the Demolition Permit Application?
- The form does not list a submission address or method. Submit it to the city department named on the form, and check the city website for current contact details.
- What should I include with the demolition application?
- The checklist calls for two site plans showing the structure location and footprint square footage, and says to complete the application with the required permit fee.
- What utility steps does the demolition checklist mention?
- It says to contact 811 and acknowledge that electrical and gas service have been disconnected. It also lists steps for on-lot septic systems, public sewer laterals, and on-lot wells.
Need something notarized?
This Demolition Permit Application doesn’t need a notary — but if you have another Economy form that does, a commissioned online notary can help.