Chalfont, PA · Bucks County
Historical and Architectural Review Board (HARB) Application
Chalfont property owners or their representatives use this application to request HARB review of proposed exterior work, signs, awnings, demolition, or construction.
What this form is
This application requests review by Chalfont’s Historical and Architectural Review Board for proposed work such as repairs, renovations, additions, signs, awnings, demolition, or new construction. Applicants provide property and project details, describe exterior work, and submit the checklist items for their project type. The form states that HARB needs the required materials to review plans for a Certificate of Appropriateness; building permits are filed after Borough Council approval.
Who needs it
Property owners or authorized representatives proposing exterior work or other listed projects in Chalfont’s Historic District should complete this application.
How to submit it
Submit two copies of the application and drawings, plus one copy of other items, to the Chalfont Borough Building and Zoning Department at least 15 calendar days before the next scheduled HARB meeting.
About notarization
This application is signed and dated without a notary; the form asks for no sworn or notarized attachment.
How to submit this form
- 1
Download the Application
Download the HARB application and review the submission checklist for your project type.
- 2
Complete the Application
Provide the property, owner, applicant, and project details, describe the exterior work, and sign and date the form.
- 3
Gather Required Materials
Prepare the required map, photographs, drawings, and material samples listed for your project.
- 4
Submit to the Borough
Send two copies of the application and drawings and one copy of other items to the Building and Zoning Department at least 15 calendar days before the next HARB meeting.
Frequently asked questions
- Do I need a notary for the HARB application?
- No. This application is signed and dated without a notary, and the form asks for no sworn or notarized attachment.
- How do I submit the HARB application?
- Submit two copies of the application and drawings, plus one copy of other items, to the Chalfont Borough Building and Zoning Department at least 15 calendar days before the next scheduled HARB meeting.
- What materials should I include with the application?
- The checklist calls for a marked Historic District map, labeled photographs, project-specific drawings, and samples or catalogue cuts of materials. Requirements vary by project type.
- Can I begin work after submitting the application?
- No. The form says building permits must be filed and stamped after Borough Council approves the Certificate of Appropriateness, and work may not begin until the stamped permit is issued.
Need something notarized?
This Historical and Architectural Review Board (HARB) Application doesn’t need a notary — but if you have another Chalfont form that does, a commissioned online notary can help.