Portage, PA · Cambria County

No notary required

Building Permit Submittal Requirements for Detached Structures Over 1,000 Square Feet

This checklist helps property owners and contractors prepare a building permit application for detached structures over 1,000 square feet accessory to a detached one-family dwelling.

What this form is

Use this checklist to identify the materials required with a building permit application for a detached accessory structure over 1,000 square feet, such as a shed, detached garage, or pavilion. It lists an affidavit of exemption, proof of workers’ compensation or a notarized form in applicable cases, a site plan, two sets of construction drawings, and a completed application. Plans are reviewed for code compliance.

Who needs it

Property owners or contractors planning a detached accessory structure over 1,000 square feet for a detached one-family dwelling should use this checklist.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This checklist is signed without a notary; the attached form must be completed and notarized if the homeowner or a contractor without workers’ compensation is constructing the structure.

How to submit this form

  1. 1

    Download The Checklist

    Download the detached structure submittal requirements PDF.

  2. 2

    Review And Complete The Checklist

    Review the listed requirements and check off each section before submitting the application.

  3. 3

    Gather Required Documents

    Prepare the applicable affidavit or insurance certificate, site plan, two sets of construction drawings, and completed permit application.

  4. 4

    Submit To The City

    Submit the application materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the detached structure checklist?
No. The checklist itself is signed without a notary. The attached form must be completed and notarized if the homeowner or a contractor without workers’ compensation is constructing the structure.
How do I submit the detached structure checklist?
Submit it to the city department named on the form; check the city website for current contact details.
What materials does the checklist ask for?
It lists an affidavit of exemption, applicable workers’ compensation documentation, a site plan, two sets of construction drawings, and a completed building permit application.

Need something notarized?

This Building Permit Submittal Requirements for Detached Structures Over 1,000 Square Feet doesn’t need a notary — but if you have another Portage form that does, a commissioned online notary can help.