Summit Hill, PA · Carbon County
Zoning Application
Property owners or applicants use this application to request a zoning permit for proposed property or structure use, construction, alteration, or movement in Summit Hill.
What this form is
Use this application to request a zoning permit for the property or structures described in your proposal. The form asks for applicant, owner, and lessee details, the activity and proposed work, property information, and an estimate of project cost. Submit it with proposed site drawings and the required fee; include a copy of the deed and a sketch showing existing and proposed buildings, structures, signs, and setbacks.
Who needs it
Applicants seeking a zoning permit for proposed property or structure use, construction, alteration, or movement in Summit Hill need this application.
How to submit it
Submit the completed application, proposed site drawings, and required fee to Summit Hill Borough. The form lists the Zoning Office at 40 West Amidon Street, Suite 3, Summit Hill, PA 18250-1533.
About notarization
This document is signed and dated without a notary; it requests a copy of the deed and site drawings, but states no attachment or related step must be notarized or sworn.
How to submit this form
- 1
Download The Application
Download the Summit Hill Zoning Application PDF.
- 2
Complete The Application
Enter the requested applicant, property, and project information, then sign and date the application.
- 3
Gather The Supporting Materials
Prepare proposed site drawings, a copy of the deed, and the required fee.
- 4
Submit To The Borough
Submit the completed application and materials to Summit Hill Borough at the Zoning Office address listed on the form.
Frequently asked questions
- Do I need a notary for the Summit Hill Zoning Application?
- No. The application has signature and date lines but no notary block. It requests a deed copy and site drawings, with no notarized or sworn attachment step stated.
- How do I submit the Summit Hill Zoning Application?
- Submit the completed application, proposed site drawings, and required fee to Summit Hill Borough. The form lists the Zoning Office at 40 West Amidon Street, Suite 3.
- What should I include with the zoning application?
- The form says to submit proposed site drawings and the required fee. It also asks for a copy of the deed and a sketch showing existing and proposed buildings, structures, signs, and setbacks.
- What information does the application ask for?
- It asks for applicant, deed owner, and lessee contact details; property and project information; a description of the activity and proposed work; and a sketch of the property.
