Paxtang, PA · Dauphin County
Street Opening Permit Application
Paxtang’s Street Opening Permit Application is for applicants seeking approval to excavate a street or street right-of-way in the borough.
What this form is
Paxtang requires a street opening permit for all excavations in streets or street rights-of-way. The application asks for applicant and contractor contact details, the work site, the proposed opening’s size and depth, estimated dates, and a work description. Applicants must submit a sketch, verify PA One Call, and provide contractor insurance proof; approval is required before work begins.
Who needs it
Applicants planning any excavation in a Paxtang street or street right-of-way need to apply, including public utilities, property owners, and contractors.
How to submit it
The document does not specify how to submit the application. Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the applicant signs and dates the application, and no notarized or sworn attachment is listed.
How to submit this form
- 1
Download The Application
Download the Street Opening Permit Application PDF.
- 2
Complete The Application
Provide applicant and contractor details, the site address, proposed opening size and depth, estimated dates, and work description.
- 3
Gather Required Items
Attach the required sketch, verify PA One Call, and provide proof of insurance for the contractor.
- 4
Submit To The Borough
Submit the application and required items to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Who needs a Paxtang street opening permit?
- The document says a permit is required for all excavations of any type in Paxtang streets or street rights-of-way. Applicants may be public utilities, property owners, or contractors.
- What must I include with the application?
- Submit a sketch on an attached 8.5-by-11-inch sheet showing the location, affected streets, excavation quantities, features, dimensions where applicable, and a north arrow. The procedures also list PA One Call verification and contractor proof of insurance.
- Do I need a notary for the Street Opening Permit Application?
- No. The applicant signs and dates the application; the document does not list a notarized or sworn attachment.
- How do I submit the Paxtang permit application?
- The document does not specify a submission method. Submit it to the city department named on the form and check the city website for current contact details.
