Colwyn, PA · Delaware County
Concrete/Driveway Permit Application
Colwyn property owners or contractors use this application to request a permit for concrete or driveway work and provide project and contact details.
What this form is
The application collects the property address, owner and contractor information, project size, square footage, and proposed material for concrete or driveway work. A certificate of insurance must accompany the application, and two sets of drawings are requested when required. The form notes that a pre-pour inspection must be scheduled for all concrete work with at least 24 hours’ notice.
Who needs it
Property owners or contractors applying for a Colwyn permit for concrete or driveway work should complete this application.
How to submit it
Submit the application to Borough Hall, 221 Spruce Street, Colwyn, PA 19023, with a certificate of insurance. Provide two sets of drawings if required.
About notarization
This document is signed without a notary; the applicant signs and dates the application.
How to submit this form
- 1
Download The Application
Download the Concrete/Driveway Permit Application PDF.
- 2
Complete The Application
Enter the date, property address, owner and contractor information, project size, square footage, and proposed material.
- 3
Gather Required Attachments
Include a certificate of insurance and provide two sets of drawings if required.
- 4
Submit To Borough Hall
Submit the application to Borough Hall, 221 Spruce Street, Colwyn, PA 19023.
Frequently asked questions
- Do I need a notary for the Concrete/Driveway Permit Application?
- No. The application has an authorized signature and date line but no notary block; the signer just signs and dates it.
- How do I submit the Concrete/Driveway Permit Application?
- Submit the application to Borough Hall at 221 Spruce Street, Colwyn, PA 19023. Include a certificate of insurance and two sets of drawings if required.
- What attachments does the application require?
- A certificate of insurance must accompany the application. The form also requests two sets of drawings when required.
- Does concrete work require a pre-pour inspection?
- The application says a pre-pour inspection must be scheduled for all concrete work, with a minimum of 24 hours’ notice.