Ridley Park, PA · Delaware County

No notary required

HARB Like-for-Like Replacement Permit Request

This request is for property owners or their contacts to seek approval for like-for-like replacement work through Ridley Park’s HARB permit process.

What this form is

Use this request for like-for-like replacement work at a Ridley Park property. It asks for the site address, owner and contact details, contractor information, work type and description, cost, work area, and current and proposed materials. The pre-application checklist calls for a contract copy, product cut sheets, and street-visible photos of the existing structure.

Who needs it

Property owners or their contacts seeking a HARB like-for-like replacement permit can complete this request with project and contractor details.

How to submit it

The form lists Ridley Park Borough at 105 E Ward Street and 610-532-2100. It does not specify a submission method; contact the Borough to confirm how to file the completed request.

About notarization

This request is signed and dated without a notary; it lists no sworn statement or notarized attachment, so the applicant just signs and dates it.

How to submit this form

  1. 1

    Download The Request

    Download the HARB Like-for-Like Replacement Permit Request for Ridley Park.

  2. 2

    Complete The Request

    Fill in the site, owner, contact, contractor, work, cost, area, and materials information.

  3. 3

    Gather Checklist Items

    Gather a contract copy, product cut sheets, and street-visible photos of the existing structure.

  4. 4

    Contact The Borough

    The form lists 105 E Ward Street and 610-532-2100; contact the Borough to confirm how to submit the request.

Frequently asked questions

Do I need a notary for the HARB replacement permit request?
No. The request has an applicant signature and date line but no notary block. It lists no sworn statement or notarized attachment.
How do I submit the HARB replacement permit request?
The form lists Ridley Park Borough at 105 E Ward Street and 610-532-2100, but does not state how to submit it. Contact the Borough to confirm the filing method.
What should I include with the request?
The pre-application checklist asks for a copy of the contract, product cut sheets, and photos showing the existing structure from the street.
What information does the request ask for?
It asks for property, owner, contact, and contractor details, plus the work type, cost, work-area size, current and proposed materials, and a description of the work.

Need something notarized?

This HARB Like-for-Like Replacement Permit Request doesn’t need a notary — but if you have another Ridley Park form that does, a commissioned online notary can help.