Ridley Park, PA · Delaware County
HARB Like-for-Like Replacement Permit Request
This request is for property owners or their contacts to seek approval for like-for-like replacement work through Ridley Park’s HARB permit process.
What this form is
Use this request for like-for-like replacement work at a Ridley Park property. It asks for the site address, owner and contact details, contractor information, work type and description, cost, work area, and current and proposed materials. The pre-application checklist calls for a contract copy, product cut sheets, and street-visible photos of the existing structure.
Who needs it
Property owners or their contacts seeking a HARB like-for-like replacement permit can complete this request with project and contractor details.
How to submit it
The form lists Ridley Park Borough at 105 E Ward Street and 610-532-2100. It does not specify a submission method; contact the Borough to confirm how to file the completed request.
About notarization
This request is signed and dated without a notary; it lists no sworn statement or notarized attachment, so the applicant just signs and dates it.
How to submit this form
- 1
Download The Request
Download the HARB Like-for-Like Replacement Permit Request for Ridley Park.
- 2
Complete The Request
Fill in the site, owner, contact, contractor, work, cost, area, and materials information.
- 3
Gather Checklist Items
Gather a contract copy, product cut sheets, and street-visible photos of the existing structure.
- 4
Contact The Borough
The form lists 105 E Ward Street and 610-532-2100; contact the Borough to confirm how to submit the request.
Frequently asked questions
- Do I need a notary for the HARB replacement permit request?
- No. The request has an applicant signature and date line but no notary block. It lists no sworn statement or notarized attachment.
- How do I submit the HARB replacement permit request?
- The form lists Ridley Park Borough at 105 E Ward Street and 610-532-2100, but does not state how to submit it. Contact the Borough to confirm the filing method.
- What should I include with the request?
- The pre-application checklist asks for a copy of the contract, product cut sheets, and photos showing the existing structure from the street.
- What information does the request ask for?
- It asks for property, owner, contact, and contractor details, plus the work type, cost, work-area size, current and proposed materials, and a description of the work.
Need something notarized?
This HARB Like-for-Like Replacement Permit Request doesn’t need a notary — but if you have another Ridley Park form that does, a commissioned online notary can help.
