Mountville, PA · Lancaster County

No notary required

Right-of-Way Construction Permit Application

Mountville Borough’s application is for applicants seeking permission to perform construction work in a borough right-of-way, including work involving wireless communication facilities.

What this form is

Use this application to request permission for construction within Mountville Borough rights-of-way. The form says it is required for installation of wireless communication facilities and above-ground facilities; excavation also requires a separate Street Excavation Permit. It asks for the project location and sketch, applicant and work details, planned dates, roadway measurements, excavation and facility information, and applicant signature.

Who needs it

Applicants proposing construction in a Mountville Borough right-of-way, including installation of wireless communication or above-ground facilities, use this application.

How to submit it

Email the completed application to [email protected]. The form says the prescribed permit fee and sketch must accompany the application, and that the fee is payable to Mountville Borough upon receipt.

About notarization

This application is signed without a notary; the applicant or authorized representative signs it, and the form does not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Right-of-Way Construction Permit Application PDF.

  2. 2

    Complete The Application

    Enter the project location, applicant details, work description, planned dates, roadway measurements, and applicable facility information; sign as the applicant or authorized representative.

  3. 3

    Gather The Sketch And Fee

    Include a sketch with the application and the prescribed permit fee. If the work involves excavation, the form says a Street Excavation Permit is required.

  4. 4

    Email The Application

    Email the completed application to [email protected]. The form says the fee is payable to Mountville Borough upon receipt.

Frequently asked questions

What is the Right-of-Way Construction Permit Application for?
It requests permission to perform construction in a Mountville Borough right-of-way and asks for project, applicant, work, and roadway details.
Do I need a notary for the Right-of-Way Construction Permit Application?
No. The application is signed by the applicant or authorized representative without a notary, and it does not identify any attachment or related step that must be notarized or sworn.
How do I submit the Right-of-Way Construction Permit Application?
Email the completed application to [email protected]. Include the sketch and prescribed permit fee; the form says the fee is payable to Mountville Borough upon receipt.
Is a separate permit needed for excavation?
Yes. The application says that if excavation will be performed, a Street Excavation Permit is required.

Need something notarized?

This Right-of-Way Construction Permit Application doesn’t need a notary — but if you have another Mountville form that does, a commissioned online notary can help.