What this form is

The application collects the work site, owner and contractor details, project description, cost, and commercial project information such as building use group and occupancy load. It also includes a direction form and municipal prior-approval section, which must be completed and signed by a municipal official before Bureau Veritas issues a building permit. Commercial plan-submittal guidelines are included for certain work on existing buildings.

Who needs it

Property owners or authorized agents applying for a building permit for commercial roof work should complete the application and municipal prior-approval information.

How to submit it

The document lists Bureau Veritas North America, Inc., 245 Allegheny Blvd., Brookville, PA 15825, as the permit contact. Have the township or borough complete and sign the municipal prior-approval section before permit issuance.

About notarization

This document is signed and dated without a notary; the application and municipal prior-approval section call for signatures, but no sworn or notarized attachment is identified.

How to submit this form

  1. 1

    Download The Application

    Download the Commercial Roof Permit Application PDF.

  2. 2

    Complete The Application

    Enter the owner, contractor, project, work-site, and commercial building details requested on the form.

  3. 3

    Gather Plan Materials

    Review the included commercial plan-submittal guidelines and prepare applicable materials, including the listed plans and municipal approval.

  4. 4

    Obtain Municipal Approval

    Have the township or borough complete and sign the municipal prior-approval section before permit issuance.

  5. 5

    Submit The Application

    Use the Bureau Veritas North America address shown on the document: 245 Allegheny Blvd., Brookville, PA 15825.

Frequently asked questions

What does the Commercial Roof Permit Application ask for?
It requests owner, contractor, work-site, project description, cost, and commercial building information. It also includes directions to the project and a municipal prior-approval section.
Do I need a notary for the Commercial Roof Permit Application?
No. The form calls for signatures and dates, not notarization. The municipal prior-approval section must also be completed and signed by a municipal official.
How do I submit the Commercial Roof Permit Application?
The document lists Bureau Veritas North America, Inc., at 245 Allegheny Blvd., Brookville, PA 15825. It says the township or borough must complete and sign the municipal prior-approval section before permit issuance.
What commercial plan materials are described in the document?
For covered work on existing buildings, the guidelines list items such as local municipal approval, site plans, building plans, and an existing certificate of occupancy or plans for the entire building if that certificate is unavailable.

Need something notarized?

This Commercial Roof Permit Application doesn’t need a notary — but if you have another Bradford form that does, a commissioned online notary can help.