Farrell, PA · Mercer County

No notary required

Gas & Oil Well Drilling Permit

This application is for applicants seeking a City of Farrell permit before beginning any aspect of a gas or oil well drilling operation.

What this form is

The application collects applicant, well-site, property-owner, drilling-company, and emergency-contact information for a proposed gas or oil well. Farrell requires a permit before drilling begins, with the application submitted at least 30 days before work starts; applicants must attach an issued Pennsylvania Department of Environmental Protection permit and a site drawing, and provide required bonds.

Who needs it

Applicants planning a gas or oil well drilling operation in Farrell need this application and must provide the required permit, site drawing, and applicable bonds.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the required state permit, site drawing, and bonds are not identified as notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Gas & Oil Well Drilling Permit application.

  2. 2

    Complete The Application

    Fill in the applicant, well, property-owner, drilling-company, and emergency-contact information, then sign and date it.

  3. 3

    Gather Required Attachments

    Attach the issued Pennsylvania Department of Environmental Protection permit and well-site drawing; provide applicable bonds.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Who uses the Gas & Oil Well Drilling Permit?
Applicants planning a gas or oil well drilling operation in Farrell use this application to request a city permit before work begins.
What must accompany the application?
Attach a copy of the issued Pennsylvania Department of Environmental Protection drilling permit and a well-site drawing. The form also lists required permit and, when applicable, road repair bonds.
Do I need a notary for the Gas & Oil Well Drilling Permit?
No. The application is signed and dated without a notary. Its required permit, site drawing, and bonds are not identified as notarized or sworn.
How do I submit the Gas & Oil Well Drilling Permit?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Gas & Oil Well Drilling Permit doesn’t need a notary — but if you have another Farrell form that does, a commissioned online notary can help.