Bryn Athyn, PA · Montgomery County

No notary required

Driveway and Shoulder Construction Permit

Property owners or contractors use this application to request permission to construct or pave a driveway connecting to a Borough road.

What this form is

Bryn Athyn Borough says it must be notified before new driveway construction, shoulder grading or paving, or reconstruction of an existing driveway within the Borough right-of-way. The application requests the road name and drive location, applicant name and contact information, applicant type, and a sketch with dimensions; a separate sheet may be used if needed. It also includes fields for the permit fee and Borough use.

Who needs it

An individual or corporation seeking permission to construct or pave a driveway connecting to a Borough road should complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application has no notary block; the applicant or authorized representative completes applicable signature fields, and no notarized attachment or sworn step is listed.

How to submit this form

  1. 1

    Download The Application

    Download the Driveway and Shoulder Construction Permit PDF.

  2. 2

    Complete The Application

    Provide the road and drive location, applicant information, applicant type, and applicable signature details.

  3. 3

    Prepare The Sketch

    Fill in sketch dimensions on the form, or use a separate sheet if required.

  4. 4

    Notify The Borough

    Notify the Borough before new driveway construction, shoulder grading or paving, or reconstruction within the Borough right-of-way.

  5. 5

    Submit The Application

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Driveway and Shoulder Construction Permit?
No. The application has no notary block, and it lists no notarized attachment or sworn step; the applicant or authorized representative completes applicable signature fields.
Who uses this permit application?
An individual or corporation applying for permission to construct or pave a driveway connecting to a Borough road can use this application.
What information does the application request?
It asks for the road name and drive location, applicant name and phone number, applicant type, and a dimensioned sketch. A separate sheet may be used for the sketch.
How do I submit the Driveway and Shoulder Construction Permit?
The form says the Borough must be notified before the covered work. It does not provide submission contact details, so check the city website for current contact information.

Need something notarized?

This Driveway and Shoulder Construction Permit doesn’t need a notary — but if you have another Bryn Athyn form that does, a commissioned online notary can help.