Notice of Proposed Commercial Installation Utility Line on Non-Controlled Access Roadway
Utility firms use this application to notify Atascosa County and request a permit for a commercial utility line in a county roadway right-of-way.
At a glance
- Issued by
- City of Atascosa County · Atascosa County, Atascosa County, Texas
- Notarization
- Not required: file this form without a notary.
- Official source
- co.atascosa.tx.us
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
This notice and permit application is for a firm proposing to install a commercial utility line within an Atascosa County roadway right-of-way. It asks for the line’s location and design, company and representative details, drawings, construction timing, and applicable pipeline permits or reports. It also sets out the firm’s commitments for construction, traffic control, erosion management, and maintenance.
Who needs it
A utility firm proposing a commercial line installation in an Atascosa County roadway right-of-way needs to complete and submit this notice.
How to submit it
Submit the application to the commissioner for the relevant precinct at the address listed on the form. Commercial installations cost $500 per mile or part of a mile; checks are payable to Atascosa County.
About notarization
This document is signed and dated without a notary; the firm’s authorized representative certifies authority and agreement by signing, with no sworn or notarized attachment identified.
How to submit this form
- 1
Download the Application
Download the utility line notice and permit application PDF.
- 2
Complete the Application
Provide the firm and representative details, line location and design, construction timing, and applicable pipeline information.
- 3
Gather Required Attachments
Attach the location drawings and any applicable T-4 permit materials or PS-48 report identified in the form.
- 4
Submit to the County
Send the application to the commissioner for the relevant precinct at the address listed on the form; include the stated commercial fee.
Frequently asked questions
- Do I need a notary for the commercial utility line application?
- No. The authorized firm representative signs and dates the application without a notary. The document identifies no sworn or notarized attachment.
- How do I submit the commercial utility line application?
- Submit it to the commissioner for the relevant precinct at the address listed on the form. The form lists precinct commissioner addresses and says checks are payable to Atascosa County.
- What information does the application ask for?
- It asks for the proposed line’s location, length, design, drawings, construction timing, firm information, and applicable pipeline permits or reports.
- What is the commercial permit fee?
- The form lists a commercial fee of $500 per mile or part of a mile, payable by check to Atascosa County.