Iowa Colony, TX · Brazoria County
Right-of-Way Permit Application
This application is for applicants seeking an Iowa Colony right-of-way permit for proposed work in the public right of way.
What this form is
Use this application to request a City of Iowa Colony permit for right-of-way work. It asks for the project name, address and work description, along with applicant, owner and engineer information. The listed submittals include a Guarantee of Performance, a required Iowa Colony ROW Bond Form, digital copies of the application and construction plans, and a $250 fee.
Who needs it
Applicants planning right-of-way work in Iowa Colony should complete this application and provide the listed submittals.
How to submit it
Deliver the application to the City of Iowa Colony with the required ROW Bond Form, Guarantee of Performance, digital copies on a flash drive, and the $250 fee.
About notarization
This application is signed and dated without a notary; the listed supporting materials are not identified as notarized or sworn.
How to submit this form
- 1
Download The Application
Download the Right-of-Way Permit Application PDF.
- 2
Complete The Application
Enter the project details and applicant, owner and engineer information, then sign and date the application.
- 3
Gather The Listed Submittals
Prepare the Guarantee of Performance, required Iowa Colony ROW Bond Form, and digital copies on a flash drive.
- 4
Deliver It To The City
Deliver the application and listed submittals to the City of Iowa Colony with the $250 fee.
Frequently asked questions
- What is the Iowa Colony Right-of-Way Permit Application for?
- It is used to apply for a City of Iowa Colony permit for right-of-way work and provides spaces for project, applicant, owner and engineer information.
- What do I submit with the application?
- The form lists a Guarantee of Performance, the required Iowa Colony ROW Bond Form, digital copies of the application and construction plans on a flash drive, and a $250 fee.
- Do I need a notary for the Right-of-Way Permit Application?
- No. The application has an applicant signature and date line, but no notary block. The listed supporting materials are not identified as notarized or sworn.
- How do I submit the Right-of-Way Permit Application?
- Deliver it to the City of Iowa Colony with the listed submittals and $250 fee. The application does not provide a specific department or submission address.
