Harlingen, TX · Cameron County

No notary required

Moving Route Application

Moving contractors use this application to provide structure, destination, and route details for a move and request city building and police route review.

What this form is

The application records the moving contractor’s contact information, the structure’s location, size and condition, its destination, and the route to be followed. A site plan is required. By signing, the contractor agrees to wait at least five working days before permit issuance and acknowledges that each structure, or separate piece of a structure, requires its own application and permit.

Who needs it

A moving contractor planning to move a structure should complete this application and provide the required site plan.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

The moving contractor signs and dates this application without a notary; the form lists a required site plan but no sworn or notarized attachment.

How to submit this form

  1. 1

    Download The Application

    Download the Moving Route Application PDF.

  2. 2

    Complete The Application

    Enter the contractor and structure details, destination address, proposed route, and planned move date, then sign and date the application.

  3. 3

    Gather The Site Plan

    Include the required site plan with the application.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Moving Route Application ask for?
It asks for contractor contact details, the structure’s location, size and condition, its destination address, and the route to be followed. A site plan is required.
Do I need a notary for the Moving Route Application?
No. The moving contractor signs and dates the application without a notary. The form requires a site plan but does not identify any sworn or notarized attachment.
How do I submit the Moving Route Application?
The form does not provide submission instructions or contact details. Submit it to the city department named on the form; check the city website for current contact details.
How long before permit issuance should I apply?
By signing, the moving contractor agrees to wait at least five working days before the permit is issued, allowing city inspectors time to investigate the application.

Need something notarized?

This Moving Route Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.