Rancho Viejo, TX · Cameron County
Right-of-Way Working Permit
Utility companies and contractors use this application to request permission for work that cuts, excavates, or otherwise disturbs a street or right-of-way.
What this form is
Use this application to request a permit for work in a Rancho Viejo street or right-of-way, including street cuts and excavation. The form asks for utility company and contractor contacts, work location and dates, excavation dimensions, work timing, and safety devices. It also requires detailed plans, specifications, and a location map; street cuts require a request for approved repair specifications.
Who needs it
A utility company or other applicant planning work that cuts, excavates, or disturbs a Rancho Viejo street or right-of-way needs to apply.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This application is signed and dated without a notary; it requires detailed plans, specifications, and a location map, but no sworn or notarized attachment.
How to submit this form
- 1
Download The Application
Download the Right-of-Way Working Permit application.
- 2
Complete The Application
Provide the utility company and contractor contacts, work location and dates, excavation details, timing, and planned warning devices and barricades.
- 3
Gather Required Attachments
Include detailed plans, specifications, and a location map. For a street cut, request approved repair specifications.
- 4
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What is the Right-of-Way Working Permit application for?
- It is used to request a permit for work that cuts, excavates, or otherwise disturbs a street or right-of-way in Rancho Viejo.
- Do I need a notary for the Right-of-Way Working Permit?
- No. The application is signed and dated without a notary. It requires detailed plans, specifications, and a location map, but no sworn or notarized attachment.
- How do I submit the Right-of-Way Working Permit?
- Submit it to the city department named on the form; check the city website for current contact details.
- What should I include with the application?
- Submit detailed plans, specifications, and a location map. If the street is to be cut, request approved repair specifications.
Need something notarized?
This Right-of-Way Working Permit doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
