Right of Way Permit Application

Property owners and contractors use this application to request a permit for easement or right-of-way work, including utility, driveway, sidewalk, open-cut, or bore work.

What this form is

This application requests city approval for proposed construction or work involving an easement or right of way, with options for utility, driveway, sidewalk, open-cut, and bore work. It asks for property owner and contractor contact details, responsible-party information, permit type, work dates, and site plan details; a license and permit bond is marked as required. If a TXDOT permit is required, the form says it must be approved before a right-of-way permit can be issued.

Who needs it

Property owners or contractors planning construction or other work in an easement or right of way can use this application to request a permit.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application has owner and contractor signature and date fields, but no notary block; the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Right of Way Permit Application PDF.

  2. 2

    Complete The Application

    Fill in the owner and contractor details, permit type, responsible-party information, work dates, and requested site plan details.

  3. 3

    Gather Attachments

    Attach a dimensional site plan indicating the existing and proposed improvements.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Right of Way Permit Application?
No. The application has owner and contractor signature and date fields, but no notary block; the signer just signs and dates it.
How do I submit the Right of Way Permit Application?
The document does not list submission details. Submit it to the city department named on the form; check the city website for current contact details.
What information does the application ask for?
It asks for owner and contractor contact information, a responsible party available for emergencies, the permit type, work dates, and site plan information.
What attachment does the application request?
The form says to attach a dimensional site plan showing existing and proposed improvements, including items such as utilities, streets, sidewalks, and a north arrow.

Need something notarized?

This Right of Way Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.