Celina, TX · Collin County

No notary required

Right-Of-Way Utility Installation Permit Application

Contractors use this application to request permission to install utility lines within the City of Celina right-of-way.

What this form is

This application gives the city notice of a proposed utility installation in a road or parcel right-of-way and requests a permit. Applicants provide owner and contractor contact details, utility and work information, and attach drawings; proof of insurance and bonding must be on file before approval. A traffic control plan is required one week in advance if the work involves a temporary road closure.

Who needs it

A contractor proposing to install a utility line within a Celina right-of-way uses this application to notify the city and request a permit.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed without a notary; it identifies no sworn or notarized attachment, and the authorized contractor representative signs the form.

How to submit this form

  1. 1

    Download The Application

    Download the Right-Of-Way Utility Installation Permit Application.

  2. 2

    Complete The Application

    Enter the owner and contractor contact details, utility type, proposed location, and installation information.

  3. 3

    Gather Required Attachments

    Attach complete drawings. Ensure proof of insurance and bonding is on file; submit a traffic control plan one week in advance if a temporary road closure is planned.

  4. 4

    Submit To The City

    Return the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the Right-Of-Way Utility Installation Permit Application?
It notifies Celina of proposed utility work in a road or parcel right-of-way and requests a permit. The form asks for owner, contractor, utility, and work details.
Do I need a notary for the Right-Of-Way Utility Installation Permit Application?
No. This application is signed without a notary; it identifies no sworn or notarized attachment, and the authorized contractor representative signs the form.
How do I submit the Right-Of-Way Utility Installation Permit Application?
The form says the application must be returned before work proceeds but does not give a submission address or department. Submit it to the city department named on the form; check the city website for current contact details.
What attachments may be required?
Attach a complete set of drawings. Proof of insurance and bonding must be on file before approval; if a temporary road closure is planned, submit a traffic control plan one week in advance for approval.