New Braunfels, TX · Comal County
Public Infrastructure Permit Application
This application is for owners or applicants seeking a New Braunfels public infrastructure permit for subdivision improvements or a public infrastructure project.
What this form is
Use this application to request a public infrastructure permit for improvements associated with the platting process or a public infrastructure project. It asks for subdivision and project details, owner, applicant, and licensed engineer contact information, and information about drainage, utilities, access, and other project conditions. The form also includes a signed checklist and lists required plans, reports, and outside approvals for processing.
Who needs it
Owners or applicants proposing subdivision public improvements or a public infrastructure project in New Braunfels should complete and sign the application and checklist.
How to submit it
The form identifies the Engineering Division at 550 Landa Street, New Braunfels, Texas 78130. It says paperless digital submittals are acceptable and that all required items and outside approvals must be submitted for processing.
About notarization
This document is signed without a notary; the owner or applicant signs and dates the application, and the owner or applicant and licensed engineer sign and date the checklist.
How to submit this form
- 1
Download the Application
Download the fillable Public Infrastructure Permit Application and checklist.
- 2
Complete the Application
Enter the project, subdivision, owner, applicant, and licensed engineer information, then sign and date the application.
- 3
Gather Required Items
Use the checklist to gather required plans, reports, and applicable outside approvals.
- 4
Submit to the City
Submit the completed materials to the Engineering Division at 550 Landa Street; paperless digital submittals are acceptable.
Frequently asked questions
- What is the Public Infrastructure Permit Application for?
- It is used to apply for a public infrastructure permit for improvements associated with the platting process or a public infrastructure project.
- Who completes the application?
- The owner or applicant provides project and contact details, signs the application, and completes the checklist with the required information and attachments.
- Do I need a notary for the Public Infrastructure Permit Application?
- No. The application and checklist call for signatures and dates, not notarization. The owner or applicant and licensed engineer sign the checklist.
- How do I submit the Public Infrastructure Permit Application?
- The form identifies the Engineering Division at 550 Landa Street, New Braunfels, Texas 78130, and says paperless digital submittals are acceptable. Include all required items and outside approvals.
Need something notarized?
This Public Infrastructure Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
