Coppell, TX · Dallas County
Right-of-Way Use Permit Application
Utility companies and contractors use this application to request City of Coppell approval for construction or other work in city rights-of-way or easements.
What this form is
This application requests a permit for proposed work in City of Coppell rights-of-way or easements. Utility and contractor representatives provide project, contact, location, schedule, and construction details, attach a plan and profile, and sign the application. The city requires approval before work begins; the form also lists work requirements and a later completion verification notice.
Who needs it
Utility companies and contractors planning construction or other work in City of Coppell rights-of-way or easements need to submit this application.
How to submit it
Submit the signed application to the Engineering Department before work begins by emailing [email protected] or delivering it to Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019.
About notarization
This document is signed and dated without a notary; the application asks utility and contractor representatives to sign, and it specifies no notarized or sworn attachments.
How to submit this form
- 1
Download The Application
Download the Right-of-Way Use Permit Application PDF.
- 2
Complete The Application
Enter applicant, utility, contractor, project, location, schedule, and work details.
- 3
Gather Required Attachments
Attach a plan and profile; include a traffic control plan if the project requires traffic lane or driveway approach closure.
- 4
Sign And Submit
Have utility and contractor representatives sign and date the application, then email or deliver it to the Engineering Department before work begins.
Frequently asked questions
- Do I need a notary for the Right-of-Way Use Permit Application?
- No. Utility and contractor representatives sign and date the application; it specifies no notarized or sworn attachments.
- How do I submit the Right-of-Way Use Permit Application?
- Email the signed application to [email protected] or deliver it to the Engineering Department at the address listed on the form. Submit it before work begins.
- What information does the application ask for?
- It requests applicant, utility, contractor, project location, construction description, and schedule information. It also asks about utility locates, street or sidewalk removal, and traffic closures.
- What should I attach to the application?
- The form asks for a plan and profile showing the proposed construction. If a traffic lane or driveway approach closure is needed, it also requires a traffic control plan.