Ector County, TX · Ector County
Site Evaluation for an On-Site Sewage Facility
This evaluation form records site and soil conditions for an on-site sewage facility and is completed by the applicant and site evaluator.
At a glance
- Issued by
- City of Ector County · Ector County, Ector County, Texas
- Notarization
- Not required: file this form without a notary.
- Official source
- ectorcountytx.gov
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
The form documents applicant and site evaluator information, soil boring or backhoe pit observations, and whether the site is suitable for a standard absorptive drainfield. The site evaluator records soil depth, texture, gravel percentage when required, and observation notes, then signs and dates the evaluation. The form does not state when the county requires it or how to submit it.
Who needs it
Applicants and site evaluators use this form to document site conditions and assess suitability for a standard absorptive drainfield.
How to submit it
Submit it to the county office named on the form; check the county website for current contact details.
About notarization
This document is signed without a notary; the site evaluator signs and dates the evaluation.
How to submit this form
- 1
Download the Form
Download the Site Evaluation for an On-Site Sewage Facility PDF.
- 2
Complete the Information
Enter the applicant and site evaluator information and record the soil boring or backhoe pit observations.
- 3
Assess Site Suitability
Mark whether the site is suitable for a standard absorptive drainfield.
- 4
Sign and Submit
The site evaluator signs and dates the form. Submit it to the county office named on the form.
Frequently asked questions
- What information does the site evaluation form request?
- It requests applicant and site evaluator information, soil boring or backhoe pit details, soil depths and textures, gravel percentages when required, observation notes, and a drainfield suitability selection.
- Who completes the site evaluation form?
- The form includes spaces for applicant and site evaluator information. The site evaluator records site and soil observations and signs and dates the evaluation.
- Do I need a notary for the Site Evaluation for an On-Site Sewage Facility?
- No. The document has no notary block; the site evaluator signs and dates the evaluation.
- How do I submit the site evaluation form?
- The document does not provide submission instructions. Submit it to the county office named on the form and check the county website for current contact details.
