Ector County, TX · Ector County
Right-Of-Way Permit
Ector County property owners or authorized representatives use this application to request permission for pipeline or utility work within a county road right-of-way.
At a glance
- Issued by
- City of Ector County · Ector County, Ector County, Texas
- Notarization
- Not required: file this form without a notary.
- Official source
- ectorcountytx.gov
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
This application requests a permit for installing or modifying pipelines or utilities within an Ector County road right-of-way. The county requires an executed permit before this work; the application asks for owner and contractor details, proposed materials and installation methods, location, schedule, and road cuts. It also includes permit conditions and calls for a location sketch and traffic control plan.
Who needs it
The product owner or the owner’s authorized representative must apply before installing or modifying material within an Ector County road right-of-way.
How to submit it
Submit the application to the Development Services Department at 1010 E. 8th St., Ste. 114, or email [email protected]. The form states a $500 fee for each county road cut.
About notarization
This document is signed and dated without a notary; it calls for a location sketch and traffic control plan, but does not identify any notarized or sworn attachment.
How to submit this form
- 1
Download the Permit
Download the Ector County Right-Of-Way Permit PDF.
- 2
Complete the Application
Enter owner and contractor details, proposed work information, location, schedule, and road-cut details.
- 3
Gather Attachments
Attach a sketch showing the construction location and description, along with a traffic control plan.
- 4
Submit to the County
Send the completed application to the Development Services Department at the address or email shown on the form.
Frequently asked questions
- Do I need a notary for the Right-Of-Way Permit?
- No. The permit has signature lines but no notary block. Include the required location sketch and traffic control plan; the form does not identify these attachments as notarized or sworn.
- How do I submit the Right-Of-Way Permit?
- Submit it to the Development Services Department at 1010 E. 8th St., Ste. 114, or email [email protected], as listed on the form.
- What information does the application ask for?
- It asks for owner and contractor contact information, proposed pipeline or utility details, work description, construction dates, county road location, and whether road cuts are needed.
- What attachments does the permit require?
- The application says to attach a sketch showing the proposed construction location and description, along with a traffic control plan.
