Stephenville, TX · Erath County

No notary required

Demolition Permit Application

Property owners or contractors use this application to request a city demolition permit and provide building, contact, asbestos survey, and planned work details.

What this form is

This application requests a demolition permit for one building and collects the job address, structure description, owner and contractor information, scope of work, and start date. It asks whether an asbestos survey has been conducted; if not, the owner/operator acknowledges responsibility for having one conducted before the permit is issued. The form also includes conditions about utilities, debris disposal, and when the permit becomes void.

Who needs it

A property owner or contractor planning to demolish a building in Stephenville should complete one application for each building.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; if no asbestos survey has been conducted, the owner/operator acknowledges responsibility to obtain one before permit issuance.

How to submit this form

  1. 1

    Download The Application

    Download the Demolition Permit Application PDF.

  2. 2

    Complete The Application

    Provide the job address, structure description, owner and contractor information, asbestos survey status, scope of work, and start date.

  3. 3

    Gather Attachments

    If the structure is identified as a historical landmark, attach photos as directed on the form.

  4. 4

    Submit To The City

    Submit the completed application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Demolition Permit Application?
No. The application has a signature and date field but no notary block. If no asbestos survey has been conducted, the owner/operator acknowledges responsibility to obtain one before permit issuance.
How do I submit the Demolition Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.
Does the application require an asbestos survey?
The form asks whether a survey has been conducted. If the answer is no, the owner/operator acknowledges responsibility for having one conducted before the permit is issued.
What information does the application request?
It asks for the job address, structure description, owner and contractor contact information, scope of work, start date, and asbestos survey status.

Need something notarized?

This Demolition Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.