Missouri City, TX · Fort Bend County

No notary required

Right of Way Permit Application

Contractors use this application to request a Missouri City permit for construction, installations, or other work in the public right of way.

What this form is

Use this application to request a permit for work in Missouri City’s right of way, including irrigation, signs, landscaping, walls and fences, utilities, network facilities, or other construction. It asks for the work type, job location, project and contractor details, work valuation, and the name of the person or agency responsible for maintenance. A construction bond equal to or greater than the construction cost must accompany the application.

Who needs it

Contractors seeking a permit for work in Missouri City’s right of way should complete this application and provide the required construction bond.

How to submit it

Submit the application and required bond to the Public Works Department, Engineering Division, at 1522 Texas Parkway, Missouri City, Texas 77489, or email [email protected].

About notarization

This application is signed without a notary; the contractor signs the form, and it identifies no attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download the Application

    Download the Right of Way Permit Application PDF.

  2. 2

    Complete the Application

    Select the type of work and provide the project, job location, contractor, valuation, and maintenance contact information.

  3. 3

    Gather the Bond

    Include a construction bond equal to or greater than the cost of construction, issued in the city’s name and good for one year of construction and maintenance.

  4. 4

    Submit to the City

    Send the application and bond to the Public Works Department, Engineering Division, or email the application contact listed on the form.

Frequently asked questions

Do I need a notary for the Right of Way Permit Application?
No. The contractor signs the application without a notary. The form requires a construction bond with the application, but does not say that the bond or another attachment must be notarized or sworn.
How do I submit the Right of Way Permit Application?
Submit the application and required construction bond to the Public Works Department, Engineering Division, at the address shown on the form, or email [email protected].
What work types does this application cover?
The form lists irrigation, signs, landscaping, walls and fences, utilities, network nodes and related facilities, and other construction in the right of way.
What must accompany the application?
The form says the contractor must submit a construction bond equal to or greater than the cost of construction. It must be good for one year of construction and maintenance and issued in the city’s name.

Need something notarized?

This Right of Way Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.