Glasscock County, TX · Glasscock County
Permit for Installation on County Rights-of-Way: Pipeline Crossings Application
Pipeline owners or their authorized representatives use this application to request Glasscock County approval for a pipeline crossing in a county road right-of-way.
At a glance
- Issued by
- City of Glasscock County · Glasscock County, Glasscock County, Texas
- Notarization
- Not required: file this form without a notary.
- Official source
- co.glasscock.tx.us
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
Glasscock County requires a permit before a pipeline is installed, constructed, rebuilt, relocated, enlarged, or otherwise modified within a county road right-of-way. The application asks for the applicant’s contact information, pipeline details, proposed construction type and location, and a construction timeline. Applicants must attach a sketch showing the proposed pipeline location and description; the document also includes county policy and specifications.
Who needs it
A pipeline owner or the owner’s authorized representative must submit this application before proposed pipeline work in a Glasscock County road right-of-way.
How to submit it
Submit the application to the County Commissioner for the precinct where the pipeline is located or to the County Judge.
About notarization
This document is signed and dated without a notary; attach the required location sketch, and a variance request for an uncased steel bore requires a signed and sealed Barlow calculation.
How to submit this form
- 1
Download the Application
Download the pipeline crossing application and its included county policy and specifications.
- 2
Complete the Application
Provide applicant details, pipeline information, construction type, road location, GPS coordinates, and the proposed construction timeline.
- 3
Gather the Attachment
Attach a sketch showing the proposed pipeline location and description. Include a signed and sealed Barlow calculation for an uncased steel bore variance request.
- 4
Submit to the County
Submit the application to the County Commissioner for the precinct where the pipeline is located or to the County Judge.
Frequently asked questions
- Do I need a notary for the pipeline crossing application?
- No. The application has signature and date fields but no notary block. Attach the location sketch; an uncased steel bore variance requires a signed and sealed Barlow calculation.
- How do I submit the pipeline crossing application?
- Submit it to the County Commissioner for the precinct where the proposed pipeline is located, or to the County Judge.
- What information does the application ask for?
- It asks for applicant contact details, pipeline size, material and use, construction type, county road location, GPS coordinates, and proposed construction dates.
- What attachment must I include?
- Attach a sketch showing the proposed pipeline’s location and description. An uncased steel bore variance request also requires a signed and sealed Barlow calculation prepared by a licensed Texas Professional Engineer.
