Tolar, TX · Hood County
Irrigation Permit Application
Property owners and irrigation contractors use this application to request a City of Tolar permit for a new irrigation system or work on an existing system.
What this form is
The application is for irrigation system work classified as new, addition, alteration, or repair; it states that a permit is needed for installation. It asks for property and applicant details, system and water-source specifications, contractor information, and included items such as a site plan and backflow location. A minimum 48-hour review period begins the day after receipt, and work cannot begin until a permit is issued.
Who needs it
Property owners and irrigation contractors can use this application to request a permit for new, added, altered, or repair irrigation work.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This application is signed without a notary; the applicant signs and dates it and signs and dates an acknowledgment of the listed TCEQ regulations.
How to submit this form
- 1
Download The Application
Download the City of Tolar Irrigation Permit Application PDF.
- 2
Complete The Application
Enter the property, applicant, irrigation system, water-source, and contractor information requested on the form.
- 3
Gather The Listed Items
Include the items indicated on the form, such as a site plan, backflow location, and digital plan.
- 4
Submit To The City
Submit the application to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the Irrigation Permit Application?
- No. This application is signed without a notary; the applicant signs and dates the application and acknowledges the listed TCEQ regulations with a signature and date.
- How do I submit the Irrigation Permit Application?
- The document does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.
- What information does the application request?
- It requests property and applicant details, irrigation system specifications, water source, contractor and license information, and information about items included with the application.
- Can work begin as soon as the application is received?
- No. The form says a minimum 48-hour review period begins at 9:00 a.m. on the day after receipt, and no work may be performed until a permit has been issued.