Application for Utility Construction

Utility applicants and contractors use this application to request approval for installing a line in a Jackson County right of way or easement.

At a glance

Issued by
City of Jackson County · Jackson County, Jackson County, Texas
Notarization
Not required: file this form without a notary.
Official source
co.jackson.tx.us
Blank form
Download the PDF
Catalogued
Machine-readable
JSON record · about the forms index

What this form is

This application requests approval to install a utility line in a county right of way or easement. Applicants provide contact information, installation location and type, proposed timeline, and a Dig Tess confirmation number, then sign and date the application. The submittal checklist calls for drawings or plans showing the work, location, traffic control, and line specifications, plus check payment.

Who needs it

An applicant proposing utility installation in a Jackson County right of way or easement should complete this application and include the required plans.

How to submit it

Submit the completed application, any required petition, and payment to the Jackson County Precinct Commissioner, if required.

About notarization

This application is signed and dated without a notary; it does not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download the Application

    Download the Jackson County Application for Utility Construction PDF.

  2. 2

    Complete the Application

    Enter applicant and contractor details, installation information, and the proposed work timeline; then sign and date the application.

  3. 3

    Gather Required Attachments

    Attach drawings or plans showing the work, location, traffic control, and line specifications. Include a petition if required.

  4. 4

    Submit to the County

    Submit the completed application, any required petition, and payment to the Jackson County Precinct Commissioner, if required.

Frequently asked questions

Do I need a notary for the Utility Construction Application?
No. This application is signed and dated without a notary, and it does not identify any attachment or related step that must be notarized or sworn.
How do I submit the Utility Construction Application?
Submit the completed application, any required petition, and payment to the Jackson County Precinct Commissioner, if required.
What should I include with the application?
The checklist calls for drawings or plans showing the work, location, traffic control, and proposed line. It also lists a check payment.
What information does the application request?
It asks for applicant and contractor contact details, installation location and type, a Dig Tess confirmation number, proposed work duration, and start and completion dates.