Hallettsville, TX · Lavaca County

No notary required

Distributed Generation Application

The Distributed Generation Application is for electric customers or representatives seeking to connect generation equipment to Hallettsville’s electric system and operate it in parallel.

What this form is

This application requests interconnection and parallel operation of distributed generation at a specified Hallettsville electric service address. It asks for customer, account, generator, operating, and startup information, along with system and manufacturer drawings and specifications. The form says acceptance is contingent on the customer executing a separate interconnection agreement and providing a valid certificate of insurance.

Who needs it

A Hallettsville electric customer or designated representative seeking to interconnect distributed generation and operate it in parallel with the city electric system needs this application.

How to submit it

The form directs applicants to return the completed application to City of Hallettsville at 101 N. Main Street, Hallettsville, TX 77964.

About notarization

This application is signed and dated without a notary; it also calls for a separate interconnection agreement and a valid certificate of insurance.

How to submit this form

  1. 1

    Download The Application

    Download the Distributed Generation Application PDF.

  2. 2

    Complete The Application

    Fill in the customer, account, generator, and operating information requested on the form.

  3. 3

    Gather Supporting Materials

    Include the requested system engineering drawings and manufacturer drawings and specifications.

  4. 4

    Return The Application

    Return the completed application to City of Hallettsville, 101 N. Main Street, Hallettsville, TX 77964.

Frequently asked questions

What does the Distributed Generation Application do?
It lets a customer or designated representative apply to connect distributed generation at a Hallettsville electric service address and operate it in parallel with the city system.
What information and supporting materials are requested?
The form requests customer and generator details, operating and startup information, system engineering drawings, manufacturer specifications, and information about the generator’s dynamic modeling values.
Do I need a notary for the Distributed Generation Application?
No. The application calls for signatures and dates without a notary. It also requires a separate interconnection agreement and a valid certificate of insurance.
How do I submit the Distributed Generation Application?
Return the completed application to City of Hallettsville, 101 N. Main Street, Hallettsville, TX 77964.