Mexia, TX · Limestone County

No notary required

Solar Panel Installation Permit Application

Property owners and contractors use this application to request a Mexia building permit for solar panel installation and provide project, contractor, and equipment details.

What this form is

The City of Mexia Building Permit Department uses this application for solar panel installation permit requests. It asks for the work location and description, homeowner details, general and electrical contractor information, and a $50 permit fee. The checklist also calls for contractor registration forms and project materials, including an aerial view, structural letter, electrical diagram, equipment configuration and specifications, and attachment details.

Who needs it

Applicants and contractors seeking a Mexia permit for solar panel installation should complete the application and provide the listed contractor forms and project materials.

How to submit it

Submit the application and listed materials to the Building Permit Department at 101 N McKinney, Mexia, TX 76667, or email [email protected]. The checklist lists a $50 permit fee.

About notarization

The application is signed and dated without a notary; the document lists no notarized or sworn attachment.

How to submit this form

  1. 1

    Download the Application

    Download the Solar Panel Installation Permit Application PDF.

  2. 2

    Complete and Sign

    Fill in the work, homeowner, and contractor information, then sign and date the application.

  3. 3

    Gather Listed Materials

    Include signed contractor registration forms and the project materials listed in the application checklist.

  4. 4

    Submit to the City

    Submit the application and listed materials to the Building Permit Department at the address or email shown on the form; the checklist lists a $50 fee.

Frequently asked questions

Do I need a notary for the Solar Panel Installation Permit Application?
No. The application provides a signature and date line and does not require a notary; it lists no notarized or sworn attachment.
How do I submit the solar panel permit application?
Submit it and the listed materials to the Building Permit Department at 101 N McKinney, Mexia, TX 76667, or email [email protected]. The checklist lists a $50 permit fee.
What materials does the application checklist request?
The checklist includes signed contractor registration forms, an aerial view showing panel location and fire access, a structural letter, electrical diagrams and equipment details, panel and equipment specifications, and attachment details.
What information does the application ask for?
It asks for the work location and description, homeowner details, and general and electrical contractor information, including company, contact, and license details.

Need something notarized?

This Solar Panel Installation Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.