Wise County, TX · Wise County
Application for Pipeline Utility Permit
Companies use this application to request permission from Wise County to install, maintain, repair, or operate utility facilities in county road rights-of-way.
At a glance
- Issued by
- City of Wise County · Wise County, Wise County, Texas
- Notarization
- Not required: file this form without a notary.
- Official source
- co.wise.tx.us
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
This application requests a permit to place pipeline or other utility facilities under, over, across, or along Wise County roads. It asks for company and representative details, the road and facility location, construction specifications, and proposed work duration. Applicants must attach detailed drawings showing the proposed installation; the application also includes conditions the company agrees to follow.
Who needs it
A company seeking permission to install, maintain, repair, or operate utility facilities in a Wise County road right-of-way should complete this application.
How to submit it
Submit the completed application and attached detailed drawings to the Wise County Engineer, whom the document identifies as the recipient.
About notarization
This document is signed and dated without a notary; it requires attached drawings, but does not state that they must be notarized or sworn.
How to submit this form
- 1
Download the Application
Download the Pipeline Utility Permit Application PDF.
- 2
Complete the Application
Enter the company, representative, road location, facility, and construction information requested.
- 3
Gather the Drawings
Attach detailed drawings showing the location and description of the proposed installation and appurtenances.
- 4
Submit to the County
Send the completed application and drawings to the Wise County Engineer.
Frequently asked questions
- What is the Wise County Pipeline Utility Permit Application for?
- Companies use it to request permission to lay, construct, maintain, repair, or operate utility facilities in Wise County road rights-of-way.
- Do I need a notary for the Pipeline Utility Permit Application?
- No. The document has signature lines but no notary block. It requires attached detailed drawings, but does not say they must be notarized or sworn.
- How do I submit the Pipeline Utility Permit Application?
- Submit the completed application and attached detailed drawings to the Wise County Engineer, identified in the document as the recipient.
