Sequim, WA · Clallam County
Checklist for a Preliminary Binding Site Plan
This checklist guides applicants assembling a preliminary binding site plan application for review by the City of Sequim Department of Community Development.
What this form is
Applicants use this checklist to assemble the materials required for a preliminary binding site plan application; incomplete applications will not be accepted. It lists plan details, ownership records, environmental and engineering materials, signatures, and fees. The checklist also summarizes the criteria the Hearing Examiner considers, including consistency with city plans and standards, infrastructure, environmental safeguards, and the public interest.
Who needs it
Applicants or their representatives submitting a preliminary binding site plan application to the City of Sequim should use this checklist.
How to submit it
The document says all binding site plan applications must be received via the online portal. Include the listed materials, the applicant’s or representative’s signature, and applicable fees established by the City of Sequim.
About notarization
This checklist does not require a notary or describe a sworn attachment; the applicant or representative signs the application.
How to submit this form
- 1
Download The Checklist
Download the preliminary binding site plan checklist PDF.
- 2
Complete The Application
Prepare the application and plan information listed on the checklist.
- 3
Gather Required Materials
Collect the listed ownership records, maps, plans, environmental materials if applicable, signature, and fees.
- 4
Submit Through The Portal
Submit the application and required materials through the online portal.
Frequently asked questions
- Do I need a notary for the Preliminary Binding Site Plan Checklist?
- No. The checklist does not require notarization or mention a sworn attachment; it calls for the applicant’s or representative’s signature on the application.
- How do I submit a preliminary binding site plan application?
- The checklist says applications must be received via the online portal. Include the required materials, signature, and applicable fees.
- What materials does the checklist ask applicants to provide?
- It lists items such as a preliminary sketch, property and ownership information, maps, preliminary road, utility and stormwater plans, and environmental materials when applicable.
- Are fees listed on the checklist?
- Yes. It lists fees for the binding site plan, engineering review, software, and applicable SEPA review, as well as actual costs for legal publications and the Hearing Examiner.
Need something notarized?
This Checklist for a Preliminary Binding Site Plan doesn’t need a notary — but if you have another Sequim form that does, a commissioned online notary can help.
