Sequim, WA · Clallam County
Stormwater, Erosion and Sediment Control Plan Checklist
This checklist helps Sequim project applicants calculate hard surface areas and identify stormwater plan requirements for development or redevelopment projects.
What this form is
Use this checklist to calculate project hard surfaces and land disturbance, follow flow charts to identify applicable stormwater management requirements, and review plan elements. The document says most development involving soil disruption or construction of buildings, streets, or parking lots requires stormwater review. It asks for project area calculations and plan details, including drainage, erosion controls, and stormwater management measures.
Who needs it
Sequim residents, businesses, and contractors planning development or redevelopment that disturbs soil or creates or replaces hard surfaces may need this checklist.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the checklist contains no notarized or sworn attachment, so the signer just signs and dates it.
How to submit this form
- 1
Download The Checklist
Download the Stormwater, Erosion and Sediment Control Plan Checklist PDF.
- 2
Complete Project Calculations
Calculate the project’s land disturbance and existing, removed, proposed, and replaced hard surface areas.
- 3
Gather Plan Details
Prepare the stormwater site plan information and supporting details requested by the checklist.
- 4
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the Stormwater, Erosion and Sediment Control Plan Checklist?
- No. This checklist does not require notarization and has no notarized or sworn attachment; the signer just signs and dates it.
- How do I submit the Stormwater, Erosion and Sediment Control Plan Checklist?
- Submit it to the city department named on the form; check the city website for current contact details.
- What information does the checklist ask for?
- It includes calculations for land disturbance and hard surfaces, and asks for stormwater site plan details such as drainage features and erosion-control measures.
- Who may need this checklist?
- The document says most development involving soil disruption or construction of buildings, streets, or parking lots requires stormwater review.
Need something notarized?
This Stormwater, Erosion and Sediment Control Plan Checklist doesn’t need a notary — but if you have another Sequim form that does, a commissioned online notary can help.
