Ridgefield, WA · Clark County

No notary required

Commercial Foundation Only Permit

Commercial applicants use this permit application to provide project, property, owner, and contractor details and submit plans for foundation work.

What this form is

This application collects contact and property information for a commercial foundation-only permit, along with details about the proposed construction. The submittal checklist calls for a project narrative, site plan, foundation plan, and complete building plans; a separate plumbing permit may be required for a water connection. Plan check fees must be paid before review.

Who needs it

Commercial project applicants, property owners, and contractors use this application to request a foundation-only permit and provide required project plans.

How to submit it

Pay plan check fees before review through the permit portal or by check payable to City of Ridgefield. The form lists 510-B Pioneer Street, Ridgefield, WA 98642, and a PO Box 608 mailing address.

About notarization

This document is signed without a notary; the signer certifies the information under penalty of perjury and signs and dates the application.

How to submit this form

  1. 1

    Download The Application

    Download the Commercial Foundation Only Permit PDF.

  2. 2

    Complete The Form

    Fill in applicant, owner, contractor, property, and construction information, then sign and date the application.

  3. 3

    Gather Required Plans

    Prepare the project narrative, site plan, foundation plan, and complete building plans listed in the submittal checklist.

  4. 4

    Pay Fees And Submit

    Pay plan check fees through the permit portal or by check payable to City of Ridgefield; the form lists the city's address.

Frequently asked questions

Do I need a notary for the Commercial Foundation Only Permit?
No. The application has signature lines but no notary block. The signer certifies the information under penalty of perjury and signs and dates the form.
How do I submit the Commercial Foundation Only Permit?
Pay plan check fees before review through the permit portal or by check payable to City of Ridgefield. The form lists a street address and PO Box.
What plans and documents does the application list?
The checklist calls for a project narrative, site plan, foundation plan, and complete building plans. A separate plumbing permit may be required for a water connection.
What information does the application ask for?
It requests applicant, property owner, and contractor contact details, contractor license information, site and parcel details, construction types, and occupancy uses.

Need something notarized?

This Commercial Foundation Only Permit doesn’t need a notary — but if you have another Ridgefield form that does, a commissioned online notary can help.