Ridgefield, WA · Clark County

No notary required

Planned Unit Development Preliminary Plat Checklist

Ridgefield applicants use this checklist to prepare site information, plans, and supporting materials for a planned unit development preliminary plat application.

What this form is

This checklist organizes the site analysis and application materials for a planned unit development preliminary plat, including project plans, reports, public-notification materials, and any discretionary items identified in the pre-application report. Applicants complete the checklist and submit it with the separate Master Land Use Application and required materials through the Permit and Development Portal. The form also includes a site-analysis section and a signature certification.

Who needs it

Applicants submitting a planned unit development preliminary plat application to Ridgefield use this checklist to identify and assemble required materials.

How to submit it

Upload one electronic copy of each required application material as a separate, labeled PDF to the Permit and Development Portal; the narrative is requested in Word format. Pay application fees through the online portal at the time of application.

About notarization

This checklist is signed and dated without a notary; a separate Map of Dedication may require notarized owner or lender signatures.

How to submit this form

  1. 1

    Download The Checklist

    Download the Planned Unit Development Preliminary Plat Checklist PDF.

  2. 2

    Complete The Checklist

    Provide the requested site-analysis information, check applicable items, and sign and date the certification.

  3. 3

    Gather Required Materials

    Assemble the Master Land Use Application and required materials; check the pre-application report for any discretionary requirements.

  4. 4

    Upload To The City

    Upload each required item as a separate, labeled PDF through the Permit and Development Portal; submit the narrative in Word format.

Frequently asked questions

What is the Planned Unit Development Preliminary Plat Checklist?
It lists site-analysis information and application materials for a planned unit development preliminary plat, including plans, reports, and supporting documents.
Who uses this Ridgefield checklist?
Applicants preparing a planned unit development preliminary plat application use it to identify and assemble the required submission materials.
How do I submit the checklist?
Upload it with the required application materials through Ridgefield’s Permit and Development Portal. Each checklist item must be a separate, labeled PDF; the narrative is requested in Word format.
Do I need a notary for this checklist?
No. The checklist is signed and dated without a notary. A separate Map of Dedication may require notarized owner or lender signatures.

Need something notarized?

This Planned Unit Development Preliminary Plat Checklist doesn’t need a notary — but if you have another Ridgefield form that does, a commissioned online notary can help.