Bellevue, WA · King County
Construction Stormwater Pollution Prevention Plan Short Form
This short form helps owners or project contacts prepare a stormwater pollution prevention plan for small construction projects in Bellevue.
What this form is
The form outlines actions to reduce or eliminate sediment and other pollutants from leaving a construction site. Bellevue allows the short-form plan for sites with less than 7,000 square feet of land-disturbing activity and less than 500 cubic yards of grading. It asks for project and property details, selected best management practices, and emergency contacts, and describes required erosion and sediment control plan content and supporting materials.
Who needs it
Property owners or project contacts preparing a stormwater pollution prevention plan for a qualifying small construction project in Bellevue need this form.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the inspector signs and dates inspection reports, and the signer just signs and dates the form.
How to submit this form
- 1
Download The Form
Download the Construction Stormwater Pollution Prevention Plan Short Form PDF.
- 2
Complete Project Details
Enter property owner and contact information, project details, site conditions, and the BMPs selected for the project.
- 3
Gather Plan Materials
Attach the BMP details or specifications called out in the narrative and a pollution prevention contact list; prepare the erosion and sediment control plan as described.
- 4
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the Construction Stormwater Pollution Prevention Plan Short Form?
- No. This document has no notary block. The inspection report includes a certification signed by the inspector, but it does not call for notarization.
- How do I submit the Construction Stormwater Pollution Prevention Plan Short Form?
- Submit it to the city department named on the form; check the city website for current contact details.
- Which construction projects can use the short form?
- The form says Bellevue allows this simpler plan for sites with less than 7,000 square feet of land-disturbing activity and less than 500 cubic yards of grading.
- What supporting materials does the plan call for?
- Attach the BMP details or specifications called out in the narrative and a pollution prevention contact list. The form also describes the required contents of an erosion and sediment control plan.
Need something notarized?
This Construction Stormwater Pollution Prevention Plan Short Form doesn’t need a notary — but if you have another Bellevue form that does, a commissioned online notary can help.
