Issaquah, WA · King County

No notary required

Revision / Deferred Submittal Form

Applicants use this form to identify a permit revision or deferred design submittal and describe the materials submitted to Issaquah.

What this form is

Use this form to identify a change to an already approved submittal or a design portion deferred until after permit issuance. It asks for the permit number, project and contact details, submittal type and number if known, and a description of the submittal. Changes must be clearly clouded, and plans prepared by an architect or engineer must be stamped and signed by the design professional.

Who needs it

Applicants submitting a change to an already approved submittal or a design portion deferred until after permit issuance need this form.

How to submit it

For submission, use the listed Community Planning and Development contact: PO Box 1307, Issaquah, WA 98027, or [email protected].

About notarization

This form does not require notarization; no notarized attachment or sworn step is listed, and the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Form

    Download the Revision / Deferred Submittal Form.

  2. 2

    Complete The Form

    Enter the permit and project details, select Revision or Deferred Submittal, and describe the submittal.

  3. 3

    Prepare Plan Materials

    Clearly cloud all changes. Plans prepared by an architect or engineer must be stamped and signed by the design professional.

  4. 4

    Submit To The City

    Use the Community Planning and Development contact listed on the form: PO Box 1307, Issaquah, WA 98027, or [email protected].

Frequently asked questions

What is the Revision / Deferred Submittal Form for?
It identifies either a change to an already approved submittal or a design portion deferred until after permit issuance, and records project and submittal details.
What information does the form request?
It asks for the permit number, date, project name, contact and company details, phone, email, submittal type, number if known, and a description.
Do I need a notary for the Revision / Deferred Submittal Form?
No. This form does not require notarization, and it lists no notarized attachment or sworn step; the signer just signs and dates it.
How do I submit the Revision / Deferred Submittal Form?
The form lists Community Planning and Development, PO Box 1307, Issaquah, WA 98027, and [email protected] as contact details for submission.

Need something notarized?

This Revision / Deferred Submittal Form doesn’t need a notary — but if you have another Issaquah form that does, a commissioned online notary can help.